PROJECTS Completed Construction of a new 110/35/6 kV “SULPHANOL” substation Completed CONSTRUCTION OF THE 110/35/10 KV CLOSED TYPE SUBSTATION “DUBANDI” Completed “GOBU” ENERGY HUB Completed INSTALLATION OF 330, 220 AND 110 KV OVERHEAD ELECTRICAL TRANSMISSION LINE BETWEEN THE SUBSTATIONS INCLUDED IN THE “GOBU” ENERGY HUB Completed RECONSTRUCTED INTERSTATE STRATEGICALLY IMPORTANT 330/220/110/10 KV “YASHMA” JUNCTION SUBSTATION Completed REBUILDING OF THE LARGEST SUBSTATION “ABSHERON” 500/330/220/10 KV OF STRATEGIC IMPORTANCE IN AZERBAIJAN Completed RECONSTRUCTION OF 110/35/10 KV “AHMEDLI” SUBSTATION Completed RECONSTRUCTED GIS TYPE 220/110/6 KV “NIZAMI” SUBSTATION Completed FULL RECONSTRUCTION OF THE 110/35/10 KV “8-TH KM” SUBSTATION Completed FULL RECONSTRUCTION OF THE 220/110/10 KV “HOVSAN” SUBSTATION Completed CONSTRUCTION OF CLOSED TYPE 220/110/10 KV WITH POWER 750 MVA (3×250) “BOYUKSHOR” SUBSTATION Completed CONSTRUCTION OF NEW 110/35/6 KV “BINAGADI” SUBSTATION Completed FULL RECONSTRUCTION OF THE 110/35/6 KV “MASHTAGA” SUBSTATION Completed 110/35/6 KV “SURAKHANI” SUBSTATIONS VOLTAGE WAS CHANGED, POWER WAS INCREASED, AND DISMANTLED AND COMPLETELY REBUILT FROM AN OPEN TYPE TO A CLOSED AND GIS TYPE VERSION Completed FULL RECONSTRUCTION OF THE 220/110/10 KV “MUSHFIG” SUBSTATION Completed THE NEWLY BUILT PIER AND THE WATER PUMPING STATION ON IT Completed CONSTRUCTION OF A NEW 110/35/10 KV “SHUSHA” SUBSTATION Completed CONSTRUCTION OF 110 KV OVER HEAD ELECTRICAL TRANSMISSION LINE Completed CONSTRUCTION OF 110/35/10 KV “FUZULI” SUBSTATION Completed CONSTRUCTION OF 110/35/10 KV “SHUKURBAYLI” SUBSTATION Completed CONSTRUCTION OF 110/35/10 KV “KALBAJAR” SUBSTATION Completed RECONSTRUCTION OF “SUGOVUSHAN-1” AND “SUGOVUSHAN-2” KSES Completed CONSTRUCTION OF 110/35/10 KV “JABRAYIL” SUBSTATION Completed CONSTRUCTION OF 110/35/10 KV “GUBADLY” SUBSTATION 1 2 Next page
Completed INSTALLATION OF 330, 220 AND 110 KV OVERHEAD ELECTRICAL TRANSMISSION LINE BETWEEN THE SUBSTATIONS INCLUDED IN THE “GOBU” ENERGY HUB
Completed RECONSTRUCTED INTERSTATE STRATEGICALLY IMPORTANT 330/220/110/10 KV “YASHMA” JUNCTION SUBSTATION
Completed REBUILDING OF THE LARGEST SUBSTATION “ABSHERON” 500/330/220/10 KV OF STRATEGIC IMPORTANCE IN AZERBAIJAN
Completed CONSTRUCTION OF CLOSED TYPE 220/110/10 KV WITH POWER 750 MVA (3×250) “BOYUKSHOR” SUBSTATION
Completed 110/35/6 KV “SURAKHANI” SUBSTATIONS VOLTAGE WAS CHANGED, POWER WAS INCREASED, AND DISMANTLED AND COMPLETELY REBUILT FROM AN OPEN TYPE TO A CLOSED AND GIS TYPE VERSION