Under the leadership of the victorious Commander-in-chief, President Ilham Aliyev, a new 110/35/10 kV substation was built in Shusha to connect the city of Shusha, which was liberated from the occupation of the Azerbaijani Army, to the general energy system of Azerbaijan and to provide the city with reliable, stable, and uninterrupted electricity. The new substation, installed at the entrance of the city of Shusha and equipped with modern equipment, is connected to the remote-controlled SCADA Dispatcher Management system. The 110 kV open, 35 and 10 kV open distribution plants were created here. All parameters were taken into account in the sub-station control building, which was built in a modern style based on a specially agreed project.